Skip to main content
Skip table of contents

Known issue 2015.1: Job costing—Moving job costing lines doesn't move analysis code

The following issue has been identified and subsequently replicated by MYOB Support in EXO Business versions 2015.1 onwards.

Before upgrading your clients please take into consideration the following issues especially if the site has specific requirements in these areas.

As always we recommend that thorough testing in a non-live environment is undertaken before commencing an upgrade.

Issue

Support have replicated in 2015.1 that in Job Costing it is possible to move a cost line from one job to another job. From the 2015.1 version of Job Costing onwards when you move a cost line that has analysis codes on it to another job it will not copy the analysis codes across to the second job.

Workaround

The work-around at present it to delete the line from the first job and manually enter it into the second job.

Resolution

Attached to Problem ticket 138691021790 for resolution in a future release.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.