Skip to main content
Skip table of contents

Exo Timesheet Cost Centre Maintenance

From the Maintenance menu, select Cost Centres, then select a Cost Centre from the list that appears.

Code This is the unique code for this Cost Centre.

Name This is the name of the Cost Centre.

Analysis 1 This is the breakdown showing which part of the code belongs to the first tier of the cost centre structure, based on the structural rules set at the Head office.

Analysis 2 This is the breakdown showing which part of the code belongs to the second tier of the cost centre structure, based on the structural rules set at the Head office.

Analysis 3 This is the breakdown showing which part of the code belongs to the third tier of the cost centre structure, based on the structural rules set at the Head office.

Analysis 4 This is the breakdown showing which part of the code belongs to the fourth tier of the cost centre structure, based on the structural rules set at the Head office.

GL Ledger Code This is the general ledger code assigned to this Cost Centre.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.